hedar of page
hedar of page
:: Port fleet 99 do jobs quickly,quality,safety and at competitive prices !
Approval (2K)
home (1K)  HOME review (1K)  CONTACTS english version Българска версия
About us | Services | Tugs | Floating crane | Price list | Quality and safety |


anchor-wmaster (5K) Price list

PORT FLEET 99 SLTD

Gross tonage Tugs over 1000 HP: 1 x 2000 h.p.; 2 x 2450 h.p. 1 x 1600 h.p.; 6 x 1200 Tugs up to 1000 HP (small): 2 x 600 h.p. Price of mooring or unmooring
Port of Varna East, Power Station, Petrol, Lesport, Odessos, PChMV Port of Varna - West Port of Balchik Bulyard, Shiprepair Yard, MTG, TEREM S.A. LTH Ship shifting of Bulyard, Shiprepair Yard, MTG, TEREM S.A. LTH for each 1 tug
for 1 tug for 2 tugs for 3 and more tugs for 1 tug for 2 tugs for 3 and more tugs for 1 tug for 1 for 2 tugs for 3 and more tugs for 1 for 2 tugs for 3 and more tugs for all areas except Port of Balchik for Port of Balchik
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
up to 1000 390 780 1170 480 960 1440 480 390 780 1170 390 780 1170 280 390 55
1001 - 2000 570 1140 1710 720 1440 2160 720 530 1060 1590 510 1020 1530 380 510 85
2001 - 3000 750 1500 2250 960 1920 2880 960 670 1340 2010 630 1260 1890 480 630 110
3001 - 4000 930 1860 2790 1200 2400 3600 1200 810 1620 2430 750 1500 2250 580 750 140
4001 - 5000 1110 2220 3330 1440 2880 4320 1440 950 1900 2850 870 1740 2610 680 870 160
5001 - 6000 1290 2580 3870 1680 3360 5040 1680 1090 2180 3270 990 1980 2970 780 990 180
6001 - 7000 1470 2940 4410 1920 3840 5760 1920 1230 2460 3690 1110 2220 3330 880 1110 200
7001 - 8000 1650 3300 4950 2160 4320 6480 2160 1370 2740 4110 1230 2460 3690 980 1230 210
8001 - 9000 1830 3660 5490 2400 4800 7200 2400 1510 3020 4530 1350 2700 4050 1080 1350 220
9001 - 10000 2010 4020 6030 2640 5280 7920 2640 1650 3300 4950 1470 2940 4410 1180 1470 230
over 10000 for every 1000 50 100 150 60 120 180 60 45 90 135 45 90 135 40 45 35
1. Prices are in EUR, exclusive of VAT, which is accounted according current law.
2. In case of refusal or termination of a maneuver after tug taking off the quay because of worsened climatic conditions and prohibition for maneuvers by authorities of the Maritime Administration Executive Agency, the service shall not be paid. In all the rest cases 40 % of the value stated in the relevant columns of Table is paid.
3. Assistance of vessels in the cannels (without towing) required by the binding rules of Maritime Administration Executive Agency for Varna regions:
- When company tugs participate in the maneuver, no price is paid for leading;
- When no company's tugs participate in the maneuver, EUR 340.00 is paid for each started hour per tug.
4.When shifting ships with one tug over 1000 h.p. from one place to another within one harbour area the price under columns 2 to 8 of Table 1 shall be paid with a discount of 10%.
5. The values under col. 2 - 16 are paid with reduction of 10% by ships visiting the second area of one harbour (Varna Port Ltd.) or one and the same harbour area twice within one passage.
6. The price for maneuvering for leaving the port will raise with 30 per sent if the ship has no engine and the ship has to be towed in the areas as follows:
a) from one harbour to another, west of St. Nikola lighthouse;
b) from port area to buoy 9 road;
c) from port area to Varna road"
7. The price for use of a berthing launch is EUR 110.00 for one maneuver.
8.a) EUR 441.00 when using a tug over 1000 h.p. for towage and EUR 384.00 for a tug up to 1000 h.p.
b) EUR 250.00 when using a tug over 1000 h.p. for transport of officials, supply;
c) EUR 150.00 for use of a tug up to 1000 h.p for officials transport and provisioning, supply and other cargoes onboard ships at external roadstead and ship stopping place at buoy 9."
9. When maneuvering a ship that uses three or more tugs, the 4th tug is free of charge.
10. Work in public holidays 50% surcharge.
11. Services not included in this tariff are negotiated and charged additionally.


Port VARNA
The continuous efforts to improve the organisation and quality of work, together with the flexible trade policy make Port of Varna the best established and profitable Bulgarian port. In 2001 Varna was a Number One in handling of dry cargo in the country... see more in www.port-varna.bg
Port Varna
Gallery
One of the night manoeuvres
korab2 (13K)
  (C) 2004, portfleet99.com is trade mark of "Port fleet-99" SLTD top home
created by Partners Design hosting from Gnet.bg